Roads and tracks
Study of development of access to the technopole (2X2 WAYS) of MONASTIR (Long 6 km)
Start date of studies :
2009
End date of studies :
2009
Client :
DREHAT of Monastir
Study of the SPP and TD of the express road (2x2 lanes) including: - Geometric study of 6 km
- Study of the SPP and TD
- 8 hydraulic structures
- Geotechnical study
- Public lighting study
- Study of the APS and DAO - 8 hydraulic structures - Geotechnical study - Public lighting study