Study for the repair of the dyke protecting the “Aiguilles” site in Tabarka

Protection works

Study for the repair of the dyke protecting the “Aiguilles” site in Tabarka

Start date of studies : 2014
End date of studies : 2014
Client : Ministry of Equipment, DGSAM

  • Wave rehabilitation study
  • Reinforcement of the existing dyke and its roundhead with acropods​