Study Development of 146.3 km of tracks lot N°5

Roads and tracks

Study Development of 146.3 km of tracks lot N°5

Start date of studies : 2020
End date of studies : in progress
Client : Ministry of Equipment

Development study of rural tracks including 7 tracks in Kasserine and 12 tracks in Sidi Bouzid with a total length of approximately 146.3 km.

  • 19 tracks
  • SPP and TD study
  • 205 hydraulic structures
  • Geotechnical study
  • Environmental study.