Oil Ports
Studies for the rehabilitation of the wharf for TRAPSA tugs at the Skhira oil terminal
Start date of studies :
2012
End date of studies :
2013
Client :
Tunisian Chemical Group
- Survey of the old quay intended for the docking of tugs (result of the survey: abandon the existing one)
- Design of a new 50ml long dock
- Pile foundations
- Metal walkway 50ml long