Studies for the rehabilitation of the wharf for TRAPSA tugs at the Skhira oil terminal

Oil Ports

Studies for the rehabilitation of the wharf for TRAPSA tugs at the Skhira oil terminal

Start date of studies : 2012
End date of studies : 2013
Client : Tunisian Chemical Group

  • Survey of the old quay intended for the docking of tugs (result of the survey: abandon the existing one)
  • Design of a new 50ml long dock
    • Pile foundations
    • Metal walkway 50ml long