Protection works
Studies for the protection of sections of the coast against marine erosion - lot No 2, Cap Zebib, Bizerte
Start date of studies :
2018
End date of studies :
2019
Client :
Ministry of Equipment
- Wave refraction study
- Study of the cliff protection works consisting of 80ml of retaining wall of variable height from 3 to 7.5ml + 90ml of the riprap dike 7m high.