Rehabilitation, Repair and Protection of the Fishing Port of Zarrat against Silting

Fishing ports

Rehabilitation, Repair and Protection of the Fishing Port of Zarrat against Silting

Start date of studies : 2018
End date of studies : in progress
Client : The Ministry of Agriculture

  • Port rehabilitation and extension study
    • Addition of 200ml of quay
    • Addition of a dock for a 150T elevator
    • Technical description for the acquisition of a boat lift and a dredge.
  • Study of repair of the swell + study of agitation of the existing port
  • Sedimentological study of the existing state
  • Study of protection of the port against silting
  • Study of agitation of the proposed solutions
  • Sedimentological study of the proposed solutions