Extension study of the fishing port of Chebba

Fishing ports

Extension study of the fishing port of Chebba

Start date of studies : 2008
End date of studies : 2012
Client : The Ministry of Agriculture

  1. Port extension includes:
  • 3 jetties at -3.50 hydro on piers, each 120 m long
  • 1 jetty on batteries at -4.0 hydro, 100ml long
  • 1 straight quay 90ml long at -3.0hydro
  • Platform with an area of 5000m²
  • Extension of the fairing area by 3500m²
  • Dredging for basin extension
  1. Rehabilitation of the port includes:
  • Rehabilitation of crown beams
  • Maintenance dredging of the existing basin